The refurbishment in the ladies’ toilets was much more extensive and involved closing off the area for several weeks while the work was being done:

This is how it looked before all the work started:

Then all the old stuff had to be taken out:

We had to strip everything back to the brickwork (sounds familiar?!) before re-plastering could be done:

Then the re-plastering was done:

Plumbing and painting had to be sorted:

Piping was boxed in:

Preparation was made for the new flooring to go down:

It’s starting to look like a real floor again!

Then the new toilets and sink were installed:

Cubicle doors were fitted:

We also fitted a new hand-dryer and radiator:

Doors were added to the cubicles:

And there we are…!