The refurbishment in the ladies’ toilets was much more extensive and involved closing off the area for several weeks while the work was being done:
This is how it looked before all the work started:
Then all the old stuff had to be taken out:
We had to strip everything back to the brickwork (sounds familiar?!) before re-plastering could be done:
Plumbing and painting had to be sorted:
Piping was boxed in:
Preparation was made for the new flooring to go down:
It’s starting to look like a real floor again!
Then the new toilets and sink were installed:
Cubicle doors were fitted:
We also fitted a new hand-dryer and radiator:
Doors were added to the cubicles:
And there we are…!