As part of the ongoing refurbishment of the building, we are looking at replacing the stage curtains (which were installed when the church was opened in 1960!) with a concertina partition which can separate this part of the building from the community hall. In preparation for this work, a timber framework had to be added to the stage area this week:

IMG_2590IMG_2592IMG_2597IMG_2598