Week 5 of the school holidays and the work continues at church. The gates and railings were finished on Monday in fine weather which so far has not lasted, as the photographs taken today reveal:

IMG_2135IMG_2136Inside the building, a number of jobs were finished (putting up the last display board, sanding down rough areas, touching up of painting and so on) and the display boards have been backed:

IMG_2121 IMG_2122 IMG_2123Then it was time to fill them with information!

IMG_2125 IMG_2127 IMG_2129 IMG_2130 IMG_2132… and posters:

IMG_2131 IMG_2134